Now booking working sessions: bring the problem, leave with a plan. Book one

Home  /  Industries  /  Utility Contractors

Industries

Built for the crews that build and restore the grid.

Line construction, storm restoration, vegetation management and underground contractors run on crews, equipment and paperwork that moves too slowly. We fix storm closeout, billing and job cost visibility, and build the capability statements and proposals that get you on more bid lists. Our leadership comes from power and storm operations, so we start in your vocabulary.

Sound familiar?

  • Storm closeout takes longer than the restoration did
  • Timesheets, equipment logs and receipts arrive on paper or in texts
  • You find out a job lost money after it’s finished
  • Every company you’ve acquired runs on its own spreadsheets
  • You’re not on the bid lists for the utilities you want to work for

How we work

From stuck to running

01

Discover

Walk through your last big storm event or project, from crew mobilization to the final invoice.

02

Design

Pick the fix that saves the most time or margin before the next event.

03

Build

Build or connect it in short cycles, tested on live jobs and events.

04

Adopt

Roll it out to foremen, crews and the back office with simple training.

05

Optimize

Track closeout time, billing cycle and margin, then expand to more crews.

What changes

Get paid faster for the work you already did.

  • Storm closeout in days, not weeks
  • Field data captured once, at the source
  • Invoices built to each utility’s format from day one
  • Margin by job, crew and region while the work is running
  • More bids and vendor approvals from strong capability statements

FAQ

Questions we hear a lot

Line construction, distribution and transmission contractors, storm restoration companies, vegetation management firms, underground and directional drilling contractors, and holding companies that own several of them.

Usually, yes. We build on top of the field, accounting and ERP tools you already have, connecting them instead of replacing them, unless replacing something is clearly the better answer.

It depends on the starting point, but focused fixes like a closeout checklist, a timesheet capture app or a storm dashboard can often be in place within weeks. We start with the piece that will save the most time on the next event.

Yes. Along with operations and technology work, we build capability statements, pitch decks, proposals and websites for utility contractors.

With a working session on one problem your team wants solved, usually your last big storm event or your slowest closeout. From there we map the first fix and build it.

Insights

Insights for utility contractors

Working sessions

Bring the problem. Leave with a plan.

45 minutes with the operators who would actually do the work. We dig into what’s stuck, rough out what it’s costing you, and map the first move. No pitch deck.

  1. 1Tell us what you want to work on
  2. 2Add a few details about your business
  3. 3Pick a time that works for you

Rather talk now? 563.321.2430

Book a working sessionTakes about a minute